Navigate

BTA Associates

Architecture with Purpose

  • ABOUT
    • TEAM
    • SERVICES
    • CAREERS
  • PORTFOLIO
    • Governmental Design
    • Commercial / Developer
    • Civic & Education
    • Parking
  • CONTACT
  • NEWS
  • ABOUT
    • TEAM
    • SERVICES
    • CAREERS
  • PORTFOLIO
    • Governmental Design
    • Commercial / Developer
    • Civic & Education
    • Parking
  • CONTACT
  • NEWS

Eglin Field House

EGLIN AIR FORCE BASE, FL

This new, 11,760 SF fitness center supplements the existing fitness center facilities at Eglin AFB and replaces two existing bathhouses. The project meets the needs of additional BRAC population on base. The facility consists of separate fitness and cardio exercise areas for physical training activities and field house activities that include toilet rooms, shower rooms and locker rooms for both men and women. Each space meets all accessibility requirements ensuring all persons have full use of the facility including wounded returning veterans.

The project objectives were to provide Eglin AFB with a facility that is energy efficient, with low operating costs and the durability to minimize maintenance as low as possible, to support its mission. This project includes the very first geothermal HVAC system on Eglin AFB. The project also includes all required site work and utility systems. The project received LEED "Silver" Certification and was very close to achieving LEED "Gold" Certification.

PROJECT INFORMATION:

 

Contracting Agency

U.S. Army Corps. of Engineers, Mobile District

Contract Cost

$3,360,0645

Size

11,760 SF

Year Completed

2011

LEED Rating

LEED NC v2.2 "Silver"

leed_silver

RELATED PROJECTS

7th Special Forces Group Facilities

Eglin Air Force Base, FL

AvFID (Aviation Foreign Internal Defense) Operations and Maintenance Facilities

Duke Field, Florida
NAS Meridian

Dining Facility Replacement – NAS Meridian

NAS Meridian, MS

U.S. Environmental Protection Agency Research Support Center

Gulf Breeze, FL
CONTACT US

Download
A Developer’s Guide to Optimize Development Yield


The yield potential of a development project is a key factor for developers who are considering investing in commercial real estate in the North Gulf Coast region.

  • Careers |
  • BTA, a GHC Company
  • AA C000174 | IB 0000951