Navigate

BTA Associates

Architecture with Purpose

  • ABOUT
    • PEOPLE
    • FORMULA
  • PROJECTS
    • DOD / Public Design
    • Commercial / Developer
    • Governmental / Educational / Institutional
    • Parking
  • CLIENTS
  • SERVICES
  • CAREERS
  • BLOG
  • CONTACT
  • ABOUT
    • PEOPLE
    • FORMULA
  • PROJECTS
    • DOD / Public Design
    • Commercial / Developer
    • Governmental / Educational / Institutional
    • Parking
  • CLIENTS
  • SERVICES
  • CAREERS
  • BLOG
  • CONTACT

VT MAE Maintenance Hangar, Phase 1

PENSACOLA INTERNATIONAL AIRPORT

This is a new Maintenance, Repair and Overhaul (MRO) hangar for VT Mobile Aerospace Engineering located at Pensacola International Airport.  The hangar is 173,452 square foot facility that consists of 2 aircraft high bays that will have the ability to house a number of different aircraft configurations including six Airbus A-320 sized aircraft, four Boeing 757 or two Boeing 777 aircrafts.

Bullock Tice Associates is the designer of record and provided full design services, project management and architectural design on this project.

PROJECT INFORMATION:

 

Client

City of Pensacola

Construction Cost

$37,500,000

Size

173,452 SF

Year Completed

Estimated:  June 2018

 

RELATED PROJECTS

Northwest Florida State College

Mary Esther, FL

VT MAE Maintenance Hangar, Phase 1

Pensacola, FL

City of Pensacola Fire Station No. 1

Pensacola, FL

VA Community Based Outpatient Clinic

Eglin Air Force Base, FL
CONTACT US

Download
A Developer’s Guide to Optimize Development Yield


The yield potential of a development project is a key factor for developers who are considering investing in commercial real estate in the North Gulf Coast region.

  • Contact |
  • Location |
  • Careers |
  • BTA Company |
  • AA C000174 | IB 0000951